Greenbox temperature controller
Optimising the temperature of your mould tool is a balancing act at best.  You need a warm or hot tool tomake sure your parts are fully formed and have no surface defects, but you also need to cool the mould before the parts are removed.

  • One unit for both mould heating and cooling.
  • Max. 180C hot and min. 8C cold water circuit
  • PLC controlled active manifold allows accurate hot and cold water delivery to the same circuit within a single moulding cycle.
  • Four zones as standard, with options for more.
  • We even supply a Greenbox Engineer for a process optimisation day at your site.
THE ADVANTAGES are obvious
  • Superior cosmetic finish can be readily achieved eg: high-gloss.  This is because the tool can be run as hot as it needs to be without worrying about cycle time.
  • Dramatic reduction in the mould cooling phase offers significant cycle time reduction without compromise.
  • A single press side unit can provide a complete solution.
Date Added: 24.08.2017
Back to news overview   Back to home